Scarlet Ii Hybrid

☀ SolarIPP Non-CHP350 MW capacity

58th largest plant in California · 918th nationally

Scarlet Ii Hybrid is a solar power plant in California with a nameplate capacity of 350 MW.

Capacity350 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameScarlet Ii Hybrid
OperatorEdpr Scarlet Ii Llc
CityCantua Creek
CountyFresno County
StateCalifornia
ZIP93608
Coordinates36.60369, -120.37573

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Generators (2)

IDTechnologyFuelCapacityStatusOnline
GEN03Solar PhotovoltaicSolar200 MWOperating2024
GEN04BatteriesBattery150 MWOperating2024

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.