Ma Military Reservation Wind Project

🌬 WindIPP Non-CHP4 MW capacity

187th largest plant in Massachusetts · 8126th nationally

Ma Military Reservation Wind Project is a wind power plant in Massachusetts with a nameplate capacity of 4.5 MW. It generates roughly 9.7k MWh per year — enough to power about 922 average U.S. homes.

Its capacity factor of 25% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%25%
Peaking — intermittent or backup
Capacity5 MWnameplate
Annual Generation9.7k MWhEPA eGRID
Capacity Factor25%of theoretical max
Annual CO₂metric tons

Location

Plant NameMa Military Reservation Wind Project
OperatorAir Force Civil Engineer Center
CityOtis Ang Base Bourne
CountyBarnstable County
StateMassachusetts
ZIP02542
Coordinates41.66470, -70.59420

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasWindSolar

Generators (3)

IDTechnologyFuelCapacityStatusOnline
1Onshore Wind TurbineWind1.5 MWOperating2009
2Onshore Wind TurbineWind1.5 MWOperating2011
3Onshore Wind TurbineWind1.5 MWOperating2011

Grid context

NERC RegionNPCC
Balancing AuthorityIso New England Inc.