Madera Community Hospital is a solar power plant in California with a nameplate capacity of 1.0 MW. It generates roughly 1.1k MWh per year — enough to power about 107 average U.S. homes.
Its capacity factor of 13% reflects intermittent or peaking operation.
Run flat out every hour of the year, Madera Community Hospital could make 8.8k MWh. In 2023 it made 1.1k MWh — the same as running at full power 13 hours in every 100.
Peaking or variableCapacity factor 13%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 1250 East Almond Avenue |
|---|---|
| City | Madera |
| County | Madera County |
| State | California |
| ZIP | 93637 |
| Coordinates | 36.94111, -120.04667 |
| Operator | CleanCapital Holdings |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| 1 | Solar Photovoltaic | Solar | 1.0 MW | Operating | 2011 |
| Owner | Location | Share |
|---|---|---|
| GLC - (CA) Madera, LLC | Sacramento, CA | 10000.0% |
Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.
| NERC Region | WECC |
|---|---|
| Balancing Authority | California Independent System Operator |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.