Electric generating plantEIA plant no. 58363

Majestic II Wind

Type
Onshore Wind Turbine
Nameplate capacity
79.6 MW
Units
1
In service since
2012
Operator
NextEra Energy Majestic Wind
Location
Panhandle, Carson County, Texas
Rated 604th largest in Texas · 3194th of 14,761 in the U.S. · by nameplate

Majestic II Wind is a wind power plant in Texas with a nameplate capacity of 79.6 MW. It generates roughly 180.7k MWh per year — enough to power about 17,214 average U.S. homes.

Its capacity factor of 26% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Majestic II Wind could make 697.3k MWh. In 2023 it made 180.7k MWh — the same as running at full power 26 hours in every 100.

Nameplate, full year697.3k MWh79.6 MW × 8,760 hours
Actually generated180.7k MWhEPA eGRID, 2023 · ≈17,214 homes

Peaking or variableCapacity factor 26%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasCoalWind

Location

Address580 Fm 1342
CityPanhandle
CountyCarson County
StateTexas
ZIP79068
Coordinates35.38604, -101.57857
OperatorNextEra Energy Majestic Wind

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
WND1Onshore Wind TurbineWind79.6 MWOperating2012

Grid context

NERC RegionTRE
Balancing AuthoritySouthwest Power Pool

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Carson County

View all plants in Carson County →