ME Novel Lighthouse - Front St. Solar CS is a solar power plant in Maine with a nameplate capacity of 3.2 MW. It generates roughly 1.4k MWh per year — enough to power about 136 average U.S. homes.
Its capacity factor of 5% reflects intermittent or peaking operation.
Run flat out every hour of the year, ME Novel Lighthouse - Front St. Solar CS could make 28.0k MWh. In 2023 it made 1.4k MWh — the same as running at full power 5 hours in every 100.
Peaking or variableCapacity factor 5%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 369 West Front Street |
|---|---|
| City | Skowhegan |
| County | Somerset County |
| State | Maine |
| ZIP | 04976 |
| Coordinates | 44.74606, -69.74470 |
| Operator | Luminace Sunbeam Development Holdings, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| FRONT | Solar Photovoltaic | Solar | 3.2 MW | Operating | 2023 |
| NERC Region | NPCC |
|---|---|
| Balancing Authority | ISO New England Inc. |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.