Mendota Rich Dev Csg

☀ SolarIPP Non-CHP2 MW capacity

225th largest plant in Illinois · 10231st nationally

Mendota Rich Dev Csg is a solar power plant in Illinois with a nameplate capacity of 2.0 MW. It generates roughly 4.1k MWh per year — enough to power about 390 average U.S. homes.

Its capacity factor of 23% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%23%
Peaking — intermittent or backup
Capacity2 MWnameplate
Annual Generation4.1k MWhEPA eGRID
Capacity Factor23%of theoretical max
Annual CO₂metric tons

Location

Plant NameMendota Rich Dev Csg
Operator42nd Road Solar Llc
CityMendota
CountyLasalle County
StateIllinois
ZIP61342
Coordinates41.54134, -89.14808

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasCoalOilHydroelectricWindSolar

Generators (1)

IDTechnologyFuelCapacityStatusOnline
MENDSolar PhotovoltaicSolar2.0 MWOperating2022

Grid context

NERC RegionSERC
Balancing AuthorityPjm Interconnection, Llc

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Lasalle County

View all plants in Lasalle County →

Explore more