Electric generating plantEIA plant no. 64280

Meriwether Jackson

Type
Solar Photovoltaic
Nameplate capacity
3.0 MW
Units
1
In service since
2020
Operator
Safari Energy, LLC
Location
Machester, Meriwether County, Georgia
Rated 165th largest in Georgia · 9893rd of 14,761 in the U.S. · by nameplate

Meriwether Jackson is a solar power plant in Georgia with a nameplate capacity of 3.0 MW. It generates roughly 5.9k MWh per year — enough to power about 559 average U.S. homes.

Its capacity factor of 22% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Meriwether Jackson could make 26.3k MWh. In 2023 it made 5.9k MWh — the same as running at full power 22 hours in every 100.

Nameplate, full year26.3k MWh3.0 MW × 8,760 hours
Actually generated5.9k MWhEPA eGRID, 2023 · ≈559 homes

Peaking or variableCapacity factor 22%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBattery Storage

Location

Address2800 Judson Bulloch Rd
CityMachester
CountyMeriwether County
StateGeorgia
ZIP31816
Coordinates32.87750, -84.64437
OperatorSafari Energy, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
MJSolar PhotovoltaicSolar3.0 MWOperating2020

Ownership

OwnerLocationShare
Meriwether County GA S1, LLCNew York, NY10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionSERC
Balancing AuthoritySouthern Company Services, Inc. - Trans

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Meriwether County

View all plants in Meriwether County →