Electric generating plantEIA plant no. 64404

Mesa Carport PV

Type
Solar Photovoltaic
Nameplate capacity
4.6 MW
Units
2
In service since
2020
Operator
Apple, Inc
Location
Mesa, Maricopa County, Arizona
Rated 166th largest in Arizona · 8758th of 14,761 in the U.S. · by nameplate

Mesa Carport PV is a solar power plant in Arizona with a nameplate capacity of 4.6 MW. It generates roughly 8.1k MWh per year — enough to power about 767 average U.S. homes.

Its capacity factor of 20% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Mesa Carport PV could make 40.3k MWh. In 2023 it made 8.1k MWh — the same as running at full power 20 hours in every 100.

Nameplate, full year40.3k MWh4.6 MW × 8,760 hours
Actually generated8.1k MWhEPA eGRID, 2023 · ≈767 homes

Peaking or variableCapacity factor 20%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBattery Storage

Location

Address3740 S Signal Butte Road
CityMesa
CountyMaricopa County
StateArizona
ZIP85212
Coordinates33.34700, -111.60200
OperatorApple, Inc

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
CPTPVSolar PhotovoltaicSolar3.6 MWOperating2020
GFTPVSolar PhotovoltaicSolar1.0 MWOperating2020

Grid context

NERC RegionWECC
Balancing AuthoritySalt River Project

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Maricopa County

View all plants in Maricopa County →

Data centers near Mesa Carport PV

Data centerOperatorDistance
Apple Data CenterApple Inc.0.1 mi
EdgeCoreNot recorded1.1 mi
Data center, MesaNot recorded1.4 mi
Data center, MesaNot recorded1.6 mi
Data center, MesaNot recorded1.8 mi
ComarchNot recorded2.0 mi
EdgeConneX PHX02 Data CenterEdgeConneX2.7 mi
Data center, MesaNot recorded4.4 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more