Electric generating plantEIA plant no. 61836

Minco Wind IV, LLC

Type
Onshore Wind Turbine
Nameplate capacity
130 MW
Units
1
In service since
2018
Operator
Minco Wind IV, LLC
Location
Hinton, Canadian County, Oklahoma
Rated 75th largest in Oklahoma · 2328th of 14,761 in the U.S. · by nameplate

Minco Wind IV, LLC is a wind power plant in Oklahoma with a nameplate capacity of 130 MW. It generates roughly 463.1k MWh per year — enough to power about 44,101 average U.S. homes.

Its capacity factor of 41% puts it in the middle range — running steadily but not full-time.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Minco Wind IV, LLC could make 1.1M MWh. In 2023 it made 463.1k MWh — the same as running at full power 41 hours in every 100.

Nameplate, full year1.1M MWh130 MW × 8,760 hours
Actually generated463.1k MWhEPA eGRID, 2023 · ≈44,101 homes

Mid-meritCapacity factor 41%. It runs much of the time, but not all of it.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilWindSolarBattery Storage

Location

Address5175 CS 2560 Rd
CityHinton
CountyCanadian County
StateOklahoma
ZIP73047
Coordinates35.38105, -98.26956
OperatorMinco Wind IV, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
MIVOnshore Wind TurbineWind130 MWOperating2018

Grid context

NERC RegionMRO
Balancing AuthoritySouthwest Power Pool

About Wind plants