Mosaic Co Tampa Facility is a other fossil power plant in Florida with a nameplate capacity of 72.4 MW. It generates roughly 184.0k MWh per year — enough to power about 17,519 average U.S. homes.
Its capacity factor of 29% reflects intermittent or peaking operation.
Run flat out every hour of the year, Mosaic Co Tampa Facility could make 634.2k MWh. In 2023 it made 184.0k MWh — the same as running at full power 29 hours in every 100.
Peaking or variableCapacity factor 29%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: a boiler and turbine this size take hours to bring up from cold, so steam plants were built to run steadily for long stretches. A steam plant with a low capacity factor is usually being held in reserve, or run only through the hottest and coldest weeks.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 8813 US Highway 301 South |
|---|---|
| City | Riverview |
| County | Hillsborough County |
| State | Florida |
| ZIP | 33578 |
| Coordinates | 27.86050, -82.39030 |
| Operator | Mosaic Company |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| GEN1 | All Other | WH | 37.8 MW | Operating | 1988 |
| GEN3 | All Other | WH | 34.6 MW | Operating | 1999 |
| NERC Region | SERC |
|---|---|
| Balancing Authority | Tampa Electric Company |
Mosaic Co Tampa Facility is a federally registered power generation facility in Florida.
| Data center | Distance |
|---|---|
| Cyxtera Tampa TP1 | 6.3 mi |
| Flexential Tampa - North | 14.8 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map