Electric generating plantEIA plant no. 10004

Mosaic South Pierce Operations

Type
All Other
Nameplate capacity
38.0 MW
Units
1
In service since
1992
Operator
Mosaic Fertilizer LLC
Location
Mulberry, Polk County, Florida
Rated 263rd largest in Florida · 4357th of 14,761 in the U.S. · by nameplate

Mosaic South Pierce Operations is a other fossil power plant in Florida with a nameplate capacity of 38.0 MW. It generates roughly 155.8k MWh per year — enough to power about 14,833 average U.S. homes.

Its capacity factor of 39% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Mosaic South Pierce Operations could make 398.6k MWh. In 2023 it made 155.8k MWh — the same as running at full power 39 hours in every 100.

Nameplate, full year398.6k MWh45.5 MW × 8,760 hours
Actually generated155.8k MWhEPA eGRID, 2023 · ≈14,833 homes

In 2023 its nameplate was 45.5 MW (EPA eGRID). EIA's current inventory (EIA-860M) lists 38.0 MW operating.

Peaking or variableCapacity factor 39%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A steam plant burning fuel

fuel insteamwater returns1boiler burns fuel2steam spins turbine3generator4cooling condenses steam
  1. A boiler burns fuel to turn water into high-pressure steam.
  2. The steam pushes through a turbine, spinning it thousands of times a minute.
  3. The turbine's shaft turns a generator, which sends power to the grid.
  4. Spent steam is cooled back into water — by a cooling tower, a lake or a river — and pumped back to the boiler.

Why the numbers look like this: a boiler and turbine this size take hours to bring up from cold, so steam plants were built to run steadily for long stretches. A steam plant with a low capacity factor is usually being held in reserve, or run only through the hottest and coldest weeks.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolar

Location

Address7450 Cr 630
CityMulberry
CountyPolk County
StateFlorida
ZIP33860
Coordinates27.76522, -81.93879
OperatorMosaic Fertilizer LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
TG2All OtherWH38.0 MWOperating1992

Grid context

NERC RegionSERC
Balancing AuthorityTampa Electric Company

About Other Fossil plants

Mosaic South Pierce Operations is a federally registered power generation facility in Florida.

Other plants in Polk County

View all plants in Polk County →

Explore more