Electric generating plantEIA plant no. 59509

Murdock Solar

Type
Solar Photovoltaic
Nameplate capacity
4.0 MW
Units
1
In service since
2016
Operator
Cypress Creek Renewables
Location
Clayton, Johnston County, North Carolina
Rated 669th largest in North Carolina · 9069th of 14,761 in the U.S. · by nameplate

Murdock Solar is a solar power plant in North Carolina with a nameplate capacity of 4.0 MW. It generates roughly 6.5k MWh per year — enough to power about 616 average U.S. homes.

Its capacity factor of 18% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Murdock Solar could make 35.0k MWh. In 2023 it made 6.5k MWh — the same as running at full power 18 hours in every 100.

Nameplate, full year35.0k MWh4.0 MW × 8,760 hours
Actually generated6.5k MWhEPA eGRID, 2023 · ≈616 homes

Peaking or variableCapacity factor 18%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Location

Address2780 Guy Road
CityClayton
CountyJohnston County
StateNorth Carolina
ZIP27520
Coordinates35.66330, -78.52060
OperatorCypress Creek Renewables

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PV1Solar PhotovoltaicSolar4.0 MWOperating2016

Grid context

NERC RegionSERC
Balancing AuthorityDuke Energy Progress East

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Johnston County

View all plants in Johnston County →

Data centers near Murdock Solar

Data centerOperatorDistance
Segra Data CenterNot recorded9.0 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map