Electric generating plantEIA plant no. 59919

Nellis Solar PV II

Type
Solar Photovoltaic
Nameplate capacity
15.0 MW
Units
1
In service since
2015
Operator
Nevada Power Co
Location
North Las Vegas, Clark County, Nevada
Rated 88th largest in Nevada · 5526th of 14,761 in the U.S. · by nameplate

Nellis Solar PV II is a solar power plant in Nevada with a nameplate capacity of 15.0 MW. It generates roughly 37.4k MWh per year — enough to power about 3,565 average U.S. homes.

Its capacity factor of 28% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Nellis Solar PV II could make 131.4k MWh. In 2023 it made 37.4k MWh — the same as running at full power 28 hours in every 100.

Nameplate, full year131.4k MWh15.0 MW × 8,760 hours
Actually generated37.4k MWhEPA eGRID, 2023 · ≈3,565 homes

Peaking or variableCapacity factor 28%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomass

Location

AddressKinley Drive
CityNorth Las Vegas
CountyClark County
StateNevada
ZIP89191
Coordinates36.20667, -115.04770
OperatorNevada Power Co

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
NSPV2Solar PhotovoltaicSolar15.0 MWOperating2015

Grid context

NERC RegionWECC
Balancing AuthorityNevada Power Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Clark County

View all plants in Clark County →

Data centers near Nellis Solar PV II

Data centerOperatorDistance
CenturyLink data center, Las VegasCenturyLink1.8 mi
Flexential Las Vegas - NorthFlexential4.1 mi
Verizon data center, Las VegasVerizon4.6 mi
Switch Las Vegas 4Switch4.7 mi
Switch Las Vegas 5Switch4.7 mi
CenturyLinkLumen Technologies4.8 mi
Verizon North Las VegasVerizon5.6 mi
Flexential Las Vegas - DowntownFlexential5.9 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more