North English is a wind power plant in Iowa with a nameplate capacity of 340 MW. It generates roughly 1.3M MWh per year — enough to power about 122,448 average U.S. homes.
Its capacity factor of 43% puts it in the middle range — running steadily but not full-time.
Run flat out every hour of the year, North English could make 3.0M MWh. In 2023 it made 1.3M MWh — the same as running at full power 43 hours in every 100.
Mid-meritCapacity factor 43%. It runs much of the time, but not all of it.
How it works
Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 705 E Jefferson St |
|---|---|
| City | Montezuma |
| County | Poweshiek County |
| State | Iowa |
| ZIP | 50171 |
| Coordinates | 41.64278, -92.49906 |
| Operator | MidAmerican Energy Co |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| GT1 | Onshore Wind Turbine | Wind | 200 MW | Operating | 2018 |
| 1 | Onshore Wind Turbine | Wind | 140 MW | Operating | 2019 |
| NERC Region | MRO |
|---|---|
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. |
Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.