Electric generating plantEIA plant no. 63520

PA Solar Park II

Type
Solar Photovoltaic
Nameplate capacity
10.0 MW
Units
1
In service since
2020
Operator
RWE Clean Energy
Location
Nesquehoning, Carbon County, Pennsylvania
Rated 181st largest in Pennsylvania · 6054th of 14,761 in the U.S. · by nameplate

PA Solar Park II is a solar power plant in Pennsylvania with a nameplate capacity of 10.0 MW. It generates roughly 12.3k MWh per year — enough to power about 1,168 average U.S. homes.

Its capacity factor of 14% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, PA Solar Park II could make 87.6k MWh. In 2023 it made 12.3k MWh — the same as running at full power 14 hours in every 100.

Nameplate, full year87.6k MWh10.0 MW × 8,760 hours
Actually generated12.3k MWhEPA eGRID, 2023 · ≈1,168 homes

Peaking or variableCapacity factor 14%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

NuclearNatural GasCoalOilWindSolar

Location

Address109 Fourth Hollow Road
CityNesquehoning
CountyCarbon County
StatePennsylvania
ZIP18240
Coordinates40.86159, -75.84656
OperatorRWE Clean Energy

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PASP2Solar PhotovoltaicSolar10.0 MWOperating2020

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Carbon County

View all plants in Carbon County →

Explore more