Electric generating plantEIA plant no. 63053

Palo Alto Wind Farm

Type
Onshore Wind Turbine
Nameplate capacity
340 MW
Units
2
In service since
2020
Operator
MidAmerican Energy Co
Location
Emmetsburg, Palo Alto County, Iowa
Rated 12th largest in Iowa · 976th of 14,761 in the U.S. · by nameplate

Palo Alto Wind Farm is a wind power plant in Iowa with a nameplate capacity of 340 MW. It generates roughly 1.4M MWh per year — enough to power about 135,408 average U.S. homes.

Its capacity factor of 48% puts it in the middle range — running steadily but not full-time.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Palo Alto Wind Farm could make 3.0M MWh. In 2023 it made 1.4M MWh — the same as running at full power 48 hours in every 100.

Nameplate, full year3.0M MWh340 MW × 8,760 hours
Actually generated1.4M MWhEPA eGRID, 2023 · ≈135,408 homes

Mid-meritCapacity factor 48%. It runs much of the time, but not all of it.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilWind

Location

Address1405 25th St.,
CityEmmetsburg
CountyPalo Alto County
StateIowa
ZIP50536
Coordinates43.20669, -94.54809
OperatorMidAmerican Energy Co

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
PAWFOnshore Wind TurbineWind250 MWOperating2020
PAWF2Onshore Wind TurbineWind90.0 MWOperating2020

Grid context

NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Palo Alto County

View all plants in Palo Alto County →