Electric generating plantEIA plant no. 62122

Panda Solar NC 4, LLC

Type
Solar Photovoltaic
Nameplate capacity
2.0 MW
Units
1
In service since
2019
Operator
Panda Solar NC 4, LLC
Location
Clarkton, Bladen County, North Carolina
Rated 768th largest in North Carolina · 11103rd of 14,761 in the U.S. · by nameplate

Panda Solar NC 4, LLC is a solar power plant in North Carolina with a nameplate capacity of 2.0 MW. It generates roughly 3.9k MWh per year — enough to power about 372 average U.S. homes.

Its capacity factor of 22% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Panda Solar NC 4, LLC could make 17.5k MWh. In 2023 it made 3.9k MWh — the same as running at full power 22 hours in every 100.

Nameplate, full year17.5k MWh2.0 MW × 8,760 hours
Actually generated3.9k MWhEPA eGRID, 2023 · ≈372 homes

Peaking or variableCapacity factor 22%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

OilSolarBiomass

Location

Address2265 White Plains Church Road
CityClarkton
CountyBladen County
StateNorth Carolina
ZIP28433
Coordinates34.51941, -78.52434
OperatorPanda Solar NC 4, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
20009Solar PhotovoltaicSolar2.0 MWOperating2019

Grid context

NERC RegionSERC
Balancing AuthorityDuke Energy Progress East