Glasscock, Texas · Plant code 56921

Panther Creek Wind Farm II

Panther Creek Wind Farm II is a wind plant in Glasscock, Texas. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

Primary fuel Wind

Route-friendly label and badge.

Total capacity 116 MW

Plant nameplate capacity.

Annual generation 402,092 MWh

Annual output from imported EIA and EPA records.

Capacity factor 39%

A simple way to compare utilization.

Operations

Operations details

Sector IPP Non-CHP

Utility, IPP, industrial, or commercial style ownership.

Status Operating

Current operating status in the imported records.

Online year 2,008

Useful for technology-vintage context.

Location Big Spring, Texas

County and state routing anchor.

Emissions

Emissions details

CO2 0 tons

Annual plant-level total.

SO2 0 tons

Annual sulfur dioxide.

NOx 0 tons

Annual nitrogen oxides.

CO2 rate 0 lbs/MWh

Emission intensity, when available.

Fuel mix

Generation by fuel at the site.

Wind 402,092 MWh · 100% of generation

Ownership

Who owns the plant.

Owner Big Sky Wind, LLC

100%

Generators

Generator-level detail

Generator Technology Fuel Capacity Status Online
1 Onshore Wind Turbine Wind 116 MW Operating 2,008

Generation trend

Monthly output pattern

33,129 MWh
Jan
41,297 MWh
Feb
37,084 MWh
Mar
41,432 MWh
Apr
34,456 MWh
May
35,757 MWh
Jun
26,581 MWh
Jul
25,942 MWh
Aug
19,042 MWh
Sep
36,257 MWh
Oct
38,243 MWh
Nov
32,872 MWh
Dec

Nearby plants

Closest comparison sites

Glasscock, Texas

Sand Bluff Wind Farm

Wind

Sand Bluff Wind Farm is a wind plant in Glasscock, Texas. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

90 MW 318,241 MWh 0 tons CO2
Big Sky Wind, LLC 3.8 mi away

Glasscock, Texas

Forest Creek Wind Farm LLC

Wind

Forest Creek Wind Farm LLC is a wind plant in Glasscock, Texas. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

124 MW 180,942 MWh 0 tons CO2
Big Sky Wind, LLC 8.5 mi away

Glasscock, Texas

Garden City East BESS

Mwh

Garden City East BESS is a mwh plant in Glasscock, Texas. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

10 MW -207 MWh 0 tons CO2
HEN Infrastructure, L.L.C. + 2 more 11.1 mi away
Wind

Panther Creek Wind Farm Three is a wind plant in Sterling, Texas. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

216 MW 706,173 MWh 0 tons CO2
Big Sky Wind, LLC 11.3 mi away

Related routes

Context around this plant