Pcsp3 Airport

☀ SolarIPP Non-CHP2 MW capacity

735th largest plant in North Carolina · 9754th nationally

Pcsp3 Airport is a solar power plant in North Carolina with a nameplate capacity of 2.5 MW. It generates roughly 3.8k MWh per year — enough to power about 359 average U.S. homes.

Its capacity factor of 17% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%17%
Peaking — intermittent or backup
Capacity3 MWnameplate
Annual Generation3.8k MWhEPA eGRID
Capacity Factor17%of theoretical max
Annual CO₂metric tons

Location

Plant NamePcsp3 Airport
OperatorCarolina Solar Energy Llc
CityTimberlake
CountyPerson County
StateNorth Carolina
ZIP27583
Coordinates36.28806, -78.98611

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

CoalSolarBiomass

Generators (1)

IDTechnologyFuelCapacityStatusOnline
3Solar PhotovoltaicSolar2.5 MWOperating2011

Ownership

OwnerLocationShare
Pcsp3 Airport, LlcChapel Hill, NC10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionSERC
Balancing AuthorityDuke Energy Carolinas

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Person County