Electric generating plantEIA plant no. 7113

PEC Headworks

Type
Conventional Hydroelectric
Status
Retired December 2025
Nameplate (when running)
6.6 MW
Units
1
In service since
1990
Operator
Columbia Basin Hydropower
Location
Moses Lake, Grant County, Washington

PEC Headworks is retired. EIA's monthly generator inventory (EIA-860M, September 2026) lists every generator at this hydroelectric plant as retired; the last one retired in December 2025. It is not counted among Washington's operating plants or in any ranking on this site.

The figures below describe the plant when it ran: equipment from EIA Form 860 (2025), output and emissions from EPA eGRID (2023).

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, PEC Headworks could make 57.8k MWh. In 2023 it made 16.3k MWh — the same as running at full power 28 hours in every 100.

Nameplate, full year57.8k MWh6.6 MW × 8,760 hours
Actually generated16.3k MWhEPA eGRID, 2023 · ≈1,554 homes

Capacity factor 28% in 2023, before it retired.

How it works

A hydroelectric plant

1reservoir behind the dam2penstock3turbine + generator4water returns to the river
  1. A dam holds water back, building up height — the “head”.
  2. Water drops through a pipe called a penstock.
  3. It spins a turbine at the bottom, which turns a generator.
  4. The water flows out below the dam and back into the river.

Why the numbers look like this: output depends on how far the water falls and how much of it flows, so a hydro plant's year follows rain and snowmelt — and dam operators can hold water back for the hours when power is worth the most.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricWind

Location

AddressSr 262
CityMoses Lake
CountyGrant County
StateWashington
ZIP98837
Coordinates47.15955, -119.89631
OperatorColumbia Basin Hydropower

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1Conventional HydroelectricWater6.6 MWRetired1990

Ownership

OwnerLocationShare
Quincy-Columbia Basin Irr DistP.O. Box 188 Quincy, WA3334.0%
East Columbia Basin Irr DistOthello, WA3333.0%
South Columbia Basin Irr DistPasco, WA3333.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityPublic Utility District No. 2 of Grant County, Washington

About Hydroelectric plants

Hydroelectric plants spin turbines using falling or flowing water — typically from a dam-impounded reservoir. They are dispatchable, long-lived, and emission-free at the point of generation, though large reservoirs can disrupt rivers and ecosystems and methane can be released from flooded vegetation.