Electric generating plantEIA plant no. 68477

Pediment BESS I

Type
Batteries
Nameplate capacity
250 MW
Units
1
Operator
Pediment BESS I LLC
Location
Mesa, Maricopa County, Arizona
Rated 48th largest in Arizona · 1275th of 14,761 in the U.S. · by nameplate

Pediment BESS I is a battery storage power plant in Arizona with a nameplate capacity of 250 MW.

The 250 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBattery Storage

Location

Address3246 S Signal Butte Road
CityMesa
CountyMaricopa County
StateArizona
ZIP85212
Coordinates33.35566, -111.60212
OperatorPediment BESS I LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1BatteriesBattery250 MWTesting—

Grid context

NERC RegionWECC
Balancing AuthoritySalt River Project

About Battery Storage plants

Battery storage facilities don't generate electricity — they store it. They charge from the grid (often from solar during the day) and discharge during peak demand or to firm up renewables. EIA classifies them as power plants because they connect to the grid like one.

Other plants in Maricopa County

View all plants in Maricopa County →

Data centers near Pediment BESS I

Data centerOperatorDistance
Apple Data CenterApple Inc.0.6 mi
EdgeCoreNot recorded1.3 mi
Data center, MesaNot recorded1.5 mi
Data center, MesaNot recorded1.7 mi
Data center, MesaNot recorded1.9 mi
ComarchNot recorded1.9 mi
EdgeConneX PHX02 Data CenterEdgeConneX2.6 mi
Data center, MesaNot recorded4.4 mi