Penascal II Wind Project LLC is a wind power plant in Texas with a nameplate capacity of 202 MW. It generates roughly 315.0k MWh per year — enough to power about 29,998 average U.S. homes.
Its capacity factor of 18% reflects intermittent or peaking operation.
Run flat out every hour of the year, Penascal II Wind Project LLC could make 1.8M MWh. In 2023 it made 315.0k MWh — the same as running at full power 18 hours in every 100.
Peaking or variableCapacity factor 18%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 881 South Highway 77 |
|---|---|
| City | Sarita |
| County | Kenedy County |
| State | Texas |
| ZIP | 78385 |
| Coordinates | 27.12253, -97.55737 |
| Operator | Avangrid Power LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | Wind | 202 MW | Operating | 2010 |
| NERC Region | TRE |
|---|---|
| Balancing Authority | Electric Reliability Council of Texas, Inc. |
Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.