Electric generating plantEIA plant no. 65979

Peregrine Solar

Type
Solar Photovoltaic
Nameplate capacity
300 MW
Units
1
In service since
2025
Operator
RWE Clean Energy
Location
Gollad, Goliad County, Texas
Rated 174th largest in Texas · 1069th of 14,761 in the U.S. · by nameplate

Peregrine Solar is a solar power plant in Texas with a nameplate capacity of 300 MW.

The 300 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

CoalWindSolar

Location

Address13568 Fm 2441
CityGollad
CountyGoliad County
StateTexas
ZIP77963
Coordinates28.42790, -97.45440
OperatorRWE Clean Energy

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PSPVSolar PhotovoltaicSolar300 MWOperating2025

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Solar plants