Electric generating plantEIA plant no. 674

Pilot Butte

Type
Conventional Hydroelectric
Nameplate capacity
1.6 MW
Units
2
In service since
1925–1929
Operator
U S Bureau of Reclamation
Location
Morton, Fremont County, Wyoming
Rated 69th largest in Wyoming · 12534th of 14,761 in the U.S. · by nameplate

Pilot Butte is a hydroelectric power plant in Wyoming with a nameplate capacity of 1.6 MW.

The 1.6 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A hydroelectric plant

1reservoir behind the dam2penstock3turbine + generator4water returns to the river
  1. A dam holds water back, building up height — the “head”.
  2. Water drops through a pipe called a penstock.
  3. It spins a turbine at the bottom, which turns a generator.
  4. The water flows out below the dam and back into the river.

Why the numbers look like this: output depends on how far the water falls and how much of it flows, so a hydro plant's year follows rain and snowmelt — and dam operators can hold water back for the hours when power is worth the most.

Hydroelectric

Location

AddressN/A
CityMorton
CountyFremont County
StateWyoming
ZIP82644
Coordinates43.21902, -108.78768
OperatorU S Bureau of Reclamation

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
1Conventional HydroelectricWater0.8 MWOut of Service1925
2Conventional HydroelectricWater0.8 MWOut of Service1929

Grid context

NERC RegionWECC
Balancing AuthorityWestern Area Power Administration UGP West

About Hydroelectric plants

Hydroelectric plants spin turbines using falling or flowing water — typically from a dam-impounded reservoir. They are dispatchable, long-lived, and emission-free at the point of generation, though large reservoirs can disrupt rivers and ecosystems and methane can be released from flooded vegetation.