Electric generating plantEIA plant no. 61767

Pioneer Trail Solar Energy Center

Type
Solar Photovoltaic
Nameplate capacity
74.5 MW
Units
1
In service since
2019
Operator
Florida Power & Light Co
Location
New Smyrna Beach, Volusia County, Florida
Rated 109th largest in Florida · 3324th of 14,761 in the U.S. · by nameplate

Pioneer Trail Solar Energy Center is a solar power plant in Florida with a nameplate capacity of 74.5 MW. It generates roughly 130.8k MWh per year — enough to power about 12,461 average U.S. homes.

Its capacity factor of 20% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Pioneer Trail Solar Energy Center could make 652.6k MWh. In 2023 it made 130.8k MWh — the same as running at full power 20 hours in every 100.

Nameplate, full year652.6k MWh74.5 MW × 8,760 hours
Actually generated130.8k MWhEPA eGRID, 2023 · ≈12,461 homes

Peaking or variableCapacity factor 20%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilSolarBiomass

Location

Address4328 State Road 44
CityNew Smyrna Beach
CountyVolusia County
StateFlorida
ZIP32168
Coordinates29.08000, -81.10000
OperatorFlorida Power & Light Co

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
1Solar PhotovoltaicSolar74.5 MWOperating2019

Grid context

NERC RegionSERC
Balancing AuthorityFlorida Power & Light Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Volusia County

View all plants in Volusia County →

Explore more