Pivot Solar 37

☀ SolarIPP Non-CHP2 MW capacity

194th largest plant in Colorado · 9754th nationally

Pivot Solar 37 is a solar power plant in Colorado with a nameplate capacity of 2.5 MW.

Capacity3 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NamePivot Solar 37
OperatorPivot Energy
CitySterling
CountyLogan County
StateColorado
ZIP80722
Coordinates40.62076, -103.23437

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolar

Generators (1)

IDTechnologyFuelCapacityStatusOnline
PI37Solar PhotovoltaicSolar2.5 MWOperating2024

Grid context

NERC RegionWECC
Balancing AuthorityWestern Area Power Administration - Rocky Mountain Region

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Logan County

View all plants in Logan County →

Explore more