Platteview Solar LLC is a solar power plant in Nebraska with a nameplate capacity of 81.0 MW.
The 81.0 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 470 County Road J |
|---|---|
| City | Ashland |
| County | Saunders County |
| State | Nebraska |
| ZIP | 68003 |
| Coordinates | 41.19100, -96.37942 |
| Operator | AES Distributed Energy |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| PLTVW | Solar Photovoltaic | Solar | 81.0 MW | Operating | 2024 |
| NERC Region | MRO |
|---|---|
| Balancing Authority | Southwest Power Pool |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| Verizon Wireless data center, 4002 South 149th Circle, Omaha | 12.2 mi |
| Google data center, Omaha | 12.5 mi |
| Travelers Insurance data center, Omaha | 12.9 mi |
| Meta Sarpy Data center | 13.3 mi |
| Yahoo data center, La Vista | 15.3 mi |
| Fidelity data center, La Vista | 15.5 mi |
| Google data center, Omaha | 18.4 mi |
| Scott Data Center | 19.2 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map