Electric generating plantEIA plant no. 63753

Platteville Solar CSG, LLC

Type
Solar Photovoltaic
Nameplate capacity
1.3 MW
Units
1
In service since
2020
Operator
Greenbacker Renewable Energy Corporation
Location
Platteville, Weld County, Colorado
Rated 306th largest in Colorado · 13237th of 14,761 in the U.S. · by nameplate

Platteville Solar CSG, LLC is a solar power plant in Colorado with a nameplate capacity of 1.3 MW. It generates roughly 2.9k MWh per year — enough to power about 278 average U.S. homes.

Its capacity factor of 26% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Platteville Solar CSG, LLC could make 11.4k MWh. In 2023 it made 2.9k MWh — the same as running at full power 26 hours in every 100.

Nameplate, full year11.4k MWh1.3 MW × 8,760 hours
Actually generated2.9k MWhEPA eGRID, 2023 · ≈278 homes

Peaking or variableCapacity factor 26%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBattery Storage

Location

Address15763 County Road 31
CityPlatteville
CountyWeld County
StateColorado
ZIP80651
Coordinates40.22833, -104.77471
OperatorGreenbacker Renewable Energy Corporation

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
218Solar PhotovoltaicSolar1.3 MWOperating2020

Grid context

NERC RegionWECC
Balancing AuthorityPublic Service Company of Colorado

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Weld County

View all plants in Weld County →

Explore more