Electric generating plantEIA plant no. 67063

Ports Newark 8201 Solar

Type
Solar Photovoltaic
Nameplate capacity
1.4 MW
Units
1
In service since
2022
Operator
Prologis Logistics Services Incorporated
Location
Newark, Essex County, New Jersey
Rated 347th largest in New Jersey · 13098th of 14,761 in the U.S. · by nameplate

Ports Newark 8201 Solar is a solar power plant in New Jersey with a nameplate capacity of 1.4 MW. It generates roughly 14 MWh per year — enough to power about 1 average U.S. homes.

Its capacity factor of 0% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Ports Newark 8201 Solar could make 12.3k MWh. In 2023 it made 14 MWh — the same as running at full power less than 1 hours in every 100.

Nameplate, full year12.3k MWh1.4 MW × 8,760 hours
Actually generated14 MWhEPA eGRID, 2023 · ≈1 homes

Peaking or variableCapacity factor 0%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasWindSolarBiomass

Location

Address160 Mt. Olivet Avenue
CityNewark
CountyEssex County
StateNew Jersey
ZIP07114
Coordinates40.69164, -74.19649
OperatorPrologis Logistics Services Incorporated

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
NJ201Solar PhotovoltaicSolar1.4 MWOperating2022

Ownership

OwnerLocationShare
Esnj-Pld-Newark2, LLCDenver, CO10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Essex County

View all plants in Essex County →

Data centers near Ports Newark 8201 Solar

Data centerOperatorDistance
165 Halsey / Equinix NY1 / Databank EWR1Tishman3.3 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more