Progress Manis I is a solar power plant in North Carolina with a nameplate capacity of 2.0 MW. It generates roughly 2.3k MWh per year — enough to power about 215 average U.S. homes.
Its capacity factor of 13% reflects intermittent or peaking operation.
Run flat out every hour of the year, Progress Manis I could make 17.5k MWh. In 2023 it made 2.3k MWh — the same as running at full power 13 hours in every 100.
Peaking or variableCapacity factor 13%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 1520 Stewartsville Road |
|---|---|
| City | Laurinburg |
| County | Scotland County |
| State | North Carolina |
| ZIP | 28352 |
| Coordinates | 34.75639, -79.44722 |
| Operator | USF Surry, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| P11A | Solar Photovoltaic | Solar | 2.0 MW | Operating | 2012 |
| NERC Region | SERC |
|---|---|
| Balancing Authority | Duke Energy Progress East |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.