Prospero Solar II is a solar power plant in Texas with a nameplate capacity of 250 MW. It generates roughly 672.1k MWh per year — enough to power about 64,014 average U.S. homes.
Its capacity factor of 31% reflects intermittent or peaking operation.
Run flat out every hour of the year, Prospero Solar II could make 2.2M MWh. In 2023 it made 672.1k MWh — the same as running at full power 31 hours in every 100.
Peaking or variableCapacity factor 31%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 7510 Sw 900 |
|---|---|
| City | Andrews |
| County | Andrews County |
| State | Texas |
| ZIP | 79714 |
| Coordinates | 32.27581, -102.84481 |
| Operator | Prospero Solar II, LLC (Longroad) |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| PROSP | Solar Photovoltaic | Solar | 250 MW | Operating | 2021 |
| NERC Region | TRE |
|---|---|
| Balancing Authority | Electric Reliability Council of Texas, Inc. |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.