Pure Hedge LLC is retired. EIA's monthly generator inventory (EIA-860M, September 2026) lists every generator at this solar plant as retired; the last one retired in January 2017. It is not counted among Connecticut's operating plants or in any ranking on this site.
EIA also lists 2 planned generators at this plant (90.0 MW nameplate): a proposed project, not yet operating.
The figures below describe the plant when it ran: equipment from EIA Form 860 (2025).
The 31.3 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: a boiler and turbine this size take hours to bring up from cold, so steam plants were built to run steadily for long stretches. A steam plant with a low capacity factor is usually being held in reserve, or run only through the hottest and coldest weeks.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | P.O. Box 188 |
|---|---|
| City | Sterling |
| County | Windham County |
| State | Connecticut |
| ZIP | 06377 |
| Coordinates | 41.71245, -71.82225 |
| Operator | Pure Hedge LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| GEN1 | All Other | TDF | 31.3 MW | Retired | 1991 |
| Owner | Location | Share |
|---|---|---|
| ReEnergy Holdings LLC | 10000.0% |
Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.
| NERC Region | NPCC |
|---|---|
| Balancing Authority | ISO New England Inc. |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.