Rail Trail

☀ SolarIPP Non-CHP2 MW capacity

393rd largest plant in Massachusetts · 10231st nationally

Rail Trail is a solar power plant in Massachusetts with a nameplate capacity of 2.0 MW. It generates roughly 3.1k MWh per year — enough to power about 299 average U.S. homes.

Its capacity factor of 18% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%18%
Peaking — intermittent or backup
Capacity2 MWnameplate
Annual Generation3.1k MWhEPA eGRID
Capacity Factor18%of theoretical max
Annual CO₂metric tons

Location

Plant NameRail Trail
OperatorAltus Power America Management, Llc
CityGreat Barrington
CountyBerkshire County
StateMassachusetts
ZIP01230
Coordinates42.24313, -73.36385

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasWindSolar

Generators (1)

IDTechnologyFuelCapacityStatusOnline
PV1Solar PhotovoltaicSolar2.0 MWOperating2016

Grid context

NERC RegionNPCC
Balancing AuthorityIso New England Inc.