Re Dillard 3 Llc

☀ SolarIPP Non-CHP3 MW capacity

1157th largest plant in California · 9135th nationally

Re Dillard 3 Llc is a solar power plant in California with a nameplate capacity of 3.0 MW. It generates roughly 6.2k MWh per year — enough to power about 589 average U.S. homes.

Its capacity factor of 24% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%24%
Peaking — intermittent or backup
Capacity3 MWnameplate
Annual Generation6.2k MWhEPA eGRID
Capacity Factor24%of theoretical max
Annual CO₂metric tons

Location

Plant NameRe Dillard 3 Llc
OperatorMn8 Energy Llc
CitySloughhouse
CountySacramento County
StateCalifornia
ZIP95693
Coordinates38.46194, -121.18028

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricSolarBiomassBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
DIL3Solar PhotovoltaicSolar3.0 MWOperating2012

Grid context

NERC RegionWECC
Balancing AuthorityBalancing Authority Of Northern California

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.