Electric generating plantEIA plant no. 64994

Sacramento Point West Medical Offices

Type
Solar Photovoltaic
Nameplate capacity
1.3 MW
Units
1
In service since
2020
Operator
KP Sacramento Point West Medical Offices Solar, LLC
Location
Sacramento, Sacramento County, California
Rated 1666th largest in California · 13237th of 14,761 in the U.S. · by nameplate

Sacramento Point West Medical Offices is a solar power plant in California with a nameplate capacity of 1.3 MW. It generates roughly 2.2k MWh per year — enough to power about 209 average U.S. homes.

Its capacity factor of 19% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Sacramento Point West Medical Offices could make 11.4k MWh. In 2023 it made 2.2k MWh — the same as running at full power 19 hours in every 100.

Nameplate, full year11.4k MWh1.3 MW × 8,760 hours
Actually generated2.2k MWhEPA eGRID, 2023 · ≈209 homes

Peaking or variableCapacity factor 19%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomass

Location

Address1650 Response Rd
CitySacramento
CountySacramento County
StateCalifornia
ZIP95815
Coordinates38.59631, -121.42802
OperatorKP Sacramento Point West Medical Offices Solar, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
6115Solar PhotovoltaicSolar1.3 MWOperating2020

Ownership

OwnerLocationShare
Citicorp North America Inc.New York, NY9999.0%
Forsyth Street Renewables I, LLCNew York, NY1.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityBalancing Authority of Northern California

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Sacramento County

View all plants in Sacramento County →

Data centers near Sacramento Point West Medical Offices

Data centerOperatorDistance
QTS SacramentoQuality Technology Services4.7 mi
RagingWire CA1NTT5.0 mi
RagingWire CA3NTT5.1 mi
RagingWire CA2NTT5.1 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more