Electric generating plantEIA plant no. 56506

Scurry County Wind LP

Type
Onshore Wind Turbine
Nameplate capacity
131 MW
Units
1
In service since
2007
Operator
Invenergy Services LLC
Location
Snyder, Scurry County, Texas
Rated 493rd largest in Texas · 2324th of 14,761 in the U.S. · by nameplate

Scurry County Wind LP is a wind power plant in Texas with a nameplate capacity of 131 MW. It generates roughly 233.6k MWh per year — enough to power about 22,249 average U.S. homes.

Its capacity factor of 20% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Scurry County Wind LP could make 1.1M MWh. In 2023 it made 233.6k MWh — the same as running at full power 20 hours in every 100.

Nameplate, full year1.1M MWh131 MW × 8,760 hours
Actually generated233.6k MWhEPA eGRID, 2023 · ≈22,249 homes

Peaking or variableCapacity factor 20%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasWindSolarBattery Storage

Location

Address6543 E Hwy 180
CitySnyder
CountyScurry County
StateTexas
ZIP79549
Coordinates32.72040, -100.99520
OperatorInvenergy Services LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
SCWOnshore Wind TurbineWind131 MWOperating2007

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Scurry County

View all plants in Scurry County →

Explore more