Electric generating plantEIA plant no. 57981

Senate Wind LLC

Type
Onshore Wind Turbine
Nameplate capacity
150 MW
Units
1
In service since
2012
Operator
Algonquin Power Co
Location
Bryson, Jack County, Texas
Rated 435th largest in Texas · 2042nd of 14,761 in the U.S. · by nameplate

Senate Wind LLC is a wind power plant in Texas with a nameplate capacity of 150 MW. It generates roughly 463.1k MWh per year — enough to power about 44,109 average U.S. homes.

Its capacity factor of 35% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Senate Wind LLC could make 1.3M MWh. In 2023 it made 463.1k MWh — the same as running at full power 35 hours in every 100.

Nameplate, full year1.3M MWh150 MW × 8,760 hours
Actually generated463.1k MWhEPA eGRID, 2023 · ≈44,109 homes

Peaking or variableCapacity factor 35%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasWindSolar

Location

Address1065 FM 1191 North
CityBryson
CountyJack County
StateTexas
ZIP76427
Coordinates33.20580, -98.36507
OperatorAlgonquin Power Co

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
GEN1Onshore Wind TurbineWind150 MWOperating2012

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Jack County

View all plants in Jack County →