Electric generating plantEIA plant no. 68200

Sequoia 1

Type
Solar Photovoltaic
Nameplate capacity
401 MW
Units
1
In service since
2025
Operator
Sequoia 1 Solar Project
Location
Cisco, Eastland County, Texas
Rated 133rd largest in Texas · 867th of 14,761 in the U.S. · by nameplate

Sequoia 1 is a solar power plant in Texas with a nameplate capacity of 401 MW.

The 401 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

WindSolarBattery Storage

Location

AddressTbd
CityCisco
CountyEastland County
StateTexas
ZIP76437
Coordinates32.43824, -99.15766
OperatorSequoia 1 Solar Project

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
SEQ1Solar PhotovoltaicSolar401 MWOperating2025

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Eastland County

View all plants in Eastland County →

Explore more