Sev Nm Phase 2

☀ SolarIPP Non-CHP2 MW capacity

123rd largest plant in New Mexico · 10231st nationally

Sev Nm Phase 2 is a solar power plant in New Mexico with a nameplate capacity of 2.0 MW. It generates roughly 4.3k MWh per year — enough to power about 411 average U.S. homes.

Its capacity factor of 25% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%25%
Peaking — intermittent or backup
Capacity2 MWnameplate
Annual Generation4.3k MWhEPA eGRID
Capacity Factor25%of theoretical max
Annual CO₂metric tons

Location

Plant NameSev Nm Phase 2
OperatorAltus Power America Management, Llc
CityRoswell
CountyChaves County
StateNew Mexico
ZIP88201
Coordinates33.35111, -104.50694

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Solar

Generators (1)

IDTechnologyFuelCapacityStatusOnline
NMP2Solar PhotovoltaicSolar2.0 MWOperating2013

Grid context

NERC RegionWECC
Balancing AuthoritySouthwest Power Pool

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Chaves County

View all plants in Chaves County →