Shasta College Ph2 Solar Project

☀ SolarCommercial Non-CHP2 MW capacity

1344th largest plant in California · 10231st nationally

Shasta College Ph2 Solar Project is a solar power plant in California with a nameplate capacity of 2.0 MW.

Capacity2 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameShasta College Ph2 Solar Project
OperatorTotalenergies Distributed Generation, Llc
CityRedding
CountyShasta County
StateCalifornia
ZIP96003
Coordinates40.62524, -122.31402

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomass

Generators (2)

IDTechnologyFuelCapacityStatusOnline
SCSP1Solar PhotovoltaicSolar1.5 MWTesting
SCSPBBatteriesBattery0.5 MWTesting

Ownership

OwnerLocationShare
Shasta CollegeRedding, CA10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Shasta County

View all plants in Shasta County →

Explore more