Solar Photovoltaic Project #12

☀ SolarElectric Utility0 MW capacity
Capacity1 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameSolar Photovoltaic Project #12
OperatorSouthern California Edison Co
CityOntario
CountySan Bernardino County
StateCalifornia
ZIP91761
Coordinates34.04222, -117.56167

Generators (2)

IDTechnologyFuelCapacityStatusOnline
S012ASolar PhotovoltaicSolar0.5 MWRetired2011
S012BSolar PhotovoltaicSolar0.5 MWCancelled

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

What this means

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in San Bernardino County

View all plants in San Bernardino County →