Solar Photovoltaic Project #18

☀ SolarElectric Utility1 MW capacity
Capacity2 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameSolar Photovoltaic Project #18
OperatorSouthern California Edison Co
CityFontana
CountySan Bernardino County
StateCalifornia
ZIP92335
Coordinates34.08333, -117.51639

Generators (4)

IDTechnologyFuelCapacityStatusOnline
S018ASolar PhotovoltaicSolar0.5 MWRetired2012
S018BSolar PhotovoltaicSolar0.5 MWRetired2012
S018CSolar PhotovoltaicSolar0.5 MWRetired2012
S018DSolar PhotovoltaicSolar0.5 MWCancelled

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

What this means

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in San Bernardino County

View all plants in San Bernardino County →