Solar Photovoltaic Project #44

☀ SolarElectric Utility
Capacitynameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameSolar Photovoltaic Project #44
OperatorSouthern California Edison Co
CityPerris
CountyRiverside County
StateCalifornia
ZIP92571
Coordinates33.83917, -117.22083

Generators (16)

IDTechnologyFuelCapacityStatusOnline
S44ASolar PhotovoltaicSolar0.5 MWRetired2015
S44BSolar PhotovoltaicSolar0.5 MWRetired2015
S44CSolar PhotovoltaicSolar0.5 MWRetired2015
S44DSolar PhotovoltaicSolar0.5 MWRetired2015
S44ESolar PhotovoltaicSolar0.5 MWRetired2015
S44FSolar PhotovoltaicSolar0.5 MWRetired2015
S44GSolar PhotovoltaicSolar0.5 MWRetired2015
S44HSolar PhotovoltaicSolar0.5 MWRetired2015
S44ISolar PhotovoltaicSolar0.5 MWRetired2015
S44JSolar PhotovoltaicSolar0.5 MWRetired2015
S44KSolar PhotovoltaicSolar0.5 MWRetired2015
S44LSolar PhotovoltaicSolar0.5 MWRetired2015
S44MSolar PhotovoltaicSolar0.5 MWRetired2015
S44NSolar PhotovoltaicSolar0.5 MWRetired2015
S44OSolar PhotovoltaicSolar0.5 MWRetired2015
S44PSolar PhotovoltaicSolar0.5 MWRetired2015

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

What this means

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Riverside County

View all plants in Riverside County →