Electric generating plantEIA plant no. 55803

Somerset Windpower LLC

Type
Onshore Wind Turbine
Nameplate capacity
9.0 MW
Units
1
In service since
2001
Operator
Sequitur Renewables, LLC
Location
Ohiopyle, Somerset County, Pennsylvania
Rated 185th largest in Pennsylvania · 6478th of 14,761 in the U.S. · by nameplate

Somerset Windpower LLC is a wind power plant in Pennsylvania with a nameplate capacity of 9.0 MW. It generates roughly 5.7k MWh per year — enough to power about 541 average U.S. homes.

Its capacity factor of 7% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Somerset Windpower LLC could make 78.8k MWh. In 2023 it made 5.7k MWh — the same as running at full power 7 hours in every 100.

Nameplate, full year78.8k MWh9.0 MW × 8,760 hours
Actually generated5.7k MWhEPA eGRID, 2023 · ≈541 homes

Peaking or variableCapacity factor 7%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricWindSolar

Location

Address68 Braddock Drive
CityOhiopyle
CountySomerset County
StatePennsylvania
ZIP15501
Coordinates39.97917, -79.01278
OperatorSequitur Renewables, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
EWOnshore Wind TurbineWind9.0 MWOperating2001

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Somerset County

View all plants in Somerset County →

Explore more