Electric generating plantEIA plant no. 56351

Spearville

Type
Onshore Wind Turbine
Nameplate capacity
149 MW
Units
2
In service since
2006–2010
Operator
Evergy Metro
Location
Ford, Ford County, Kansas
Rated 51st largest in Kansas · 2187th of 14,761 in the U.S. · by nameplate

Spearville is a wind power plant in Kansas with a nameplate capacity of 149 MW. It generates roughly 208.9k MWh per year — enough to power about 19,899 average U.S. homes.

Its capacity factor of 16% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Spearville could make 1.3M MWh. In 2023 it made 208.9k MWh — the same as running at full power 16 hours in every 100.

Nameplate, full year1.3M MWh149 MW × 8,760 hours
Actually generated208.9k MWhEPA eGRID, 2023 · ≈19,899 homes

Peaking or variableCapacity factor 16%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasOilWindSolar

Location

Address10311 126 Rd
CityFord
CountyFord County
StateKansas
ZIP67876
Coordinates37.86410, -99.75280
OperatorEvergy Metro

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
1Onshore Wind TurbineWind101 MWOperating2006
2Onshore Wind TurbineWind48.0 MWOperating2010

Grid context

NERC RegionMRO
Balancing AuthoritySouthwest Power Pool

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Ford County

View all plants in Ford County →