Electric generating plantEIA plant no. 65642

SR Jackson II

Type
Solar Photovoltaic
Nameplate capacity
1.0 MW
Units
1
In service since
2022
Operator
SR Jackson II, LLC
Location
Jackson, Madison County, Tennessee
Rated 108th largest in Tennessee · 13806th of 14,761 in the U.S. · by nameplate

SR Jackson II is a solar power plant in Tennessee with a nameplate capacity of 1.0 MW. It generates roughly 2.2k MWh per year — enough to power about 211 average U.S. homes.

Its capacity factor of 25% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, SR Jackson II could make 8.8k MWh. In 2023 it made 2.2k MWh — the same as running at full power 25 hours in every 100.

Nameplate, full year8.8k MWh1.0 MW × 8,760 hours
Actually generated2.2k MWhEPA eGRID, 2023 · ≈211 homes

Peaking or variableCapacity factor 25%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolar

Location

Address2375 Technology Center Drive
CityJackson
CountyMadison County
StateTennessee
ZIP38301
Coordinates35.60776, -88.91705
OperatorSR Jackson II, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
SRJA2Solar PhotovoltaicSolar1.0 MWOperating2022

Grid context

NERC RegionSERC
Balancing AuthorityTennessee Valley Authority

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.