Electric generating plantEIA plant no. 54793

Storm Lake 1

Type
Onshore Wind Turbine
Nameplate capacity
114 MW
Units
3
In service since
1999
Operator
ALLETE Clean Energy
Location
Alta, Buena Vista County, Iowa
Rated 73rd largest in Iowa · 2523rd of 14,761 in the U.S. · by nameplate

Storm Lake 1 is a wind power plant in Iowa with a nameplate capacity of 114 MW. It generates roughly 94.5k MWh per year — enough to power about 8,997 average U.S. homes.

Its capacity factor of 9% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Storm Lake 1 could make 997.8k MWh. In 2023 it made 94.5k MWh — the same as running at full power 9 hours in every 100.

Nameplate, full year997.8k MWh114 MW × 8,760 hours
Actually generated94.5k MWhEPA eGRID, 2023 · ≈8,997 homes

Peaking or variableCapacity factor 9%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

OilWind

Location

Address5320 50th Ave
CityAlta
CountyBuena Vista County
StateIowa
ZIP51002
Coordinates42.68780, -95.40500
OperatorALLETE Clean Energy

Generators (3)

IDTechnologyFuelNameplate capacityStatusOnline
EXISOnshore Wind TurbineWind113 MWOperating1999
2Onshore Wind TurbineWind0.7 MWOperating1999
3Onshore Wind TurbineWind0.7 MWOperating1999

Grid context

NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc..

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Buena Vista County

View all plants in Buena Vista County →

Explore more