Sunedison Procter & Gamble Oxnard

☀ SolarIPP Non-CHP1 MW capacity

1705th largest plant in California · 12726th nationally

Sunedison Procter & Gamble Oxnard is a solar power plant in California with a nameplate capacity of 1.0 MW. It generates roughly 1.5k MWh per year — enough to power about 140 average U.S. homes.

Its capacity factor of 17% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%17%
Peaking — intermittent or backup
Capacity1 MWnameplate
Annual Generation1.5k MWhEPA eGRID
Capacity Factor17%of theoretical max
Annual CO₂metric tons

Location

Plant NameSunedison Procter & Gamble Oxnard
OperatorSune U6 Holdings Llc
CityOxnard
CountyVentura County
StateCalifornia
ZIP95826
Coordinates34.20890, -119.13000

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomassBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
1Solar PhotovoltaicSolar1.0 MWOperating2009

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Ventura County

View all plants in Ventura County →