SV CSG South Dekalb 2 LLC is a solar power plant in Illinois with a nameplate capacity of 2.0 MW. It generates roughly 432 MWh per year — enough to power about 41 average U.S. homes.
Its capacity factor of 2% reflects intermittent or peaking operation.
Run flat out every hour of the year, SV CSG South Dekalb 2 LLC could make 17.5k MWh. In 2023 it made 432 MWh — the same as running at full power 2 hours in every 100.
Peaking or variableCapacity factor 2%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 191 E. Gurler Rd |
|---|---|
| City | Dekalb |
| County | DeKalb County |
| State | Illinois |
| ZIP | 60115 |
| Coordinates | 41.89438, -88.77130 |
| Operator | SV CSG South Dekalb 2 LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| DKLB2 | Solar Photovoltaic | Solar | 2.0 MW | Operating | 2023 |
| NERC Region | RFC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| Meta data center, Dekalb | 2.1 mi |
| Meta data center, Dekalb | 2.3 mi |
| Meta data center, Dekalb | 2.6 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map