Swift 2

💧 HydroelectricElectric Utility72 MW capacity
Capacity72 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameSwift 2
OperatorPacificorp
CityCougar
CountyCowlitz County
StateWashington
ZIP98616
Coordinates46.05940, -122.25940

Generators (2)

IDTechnologyFuelCapacityStatusOnline
21Conventional HydroelectricWater36.0 MWOut of Service1959
22Conventional HydroelectricWater36.0 MWOut of Service1958

Ownership

OwnerLocationShare
Pud No 1 Of Cowlitz CountyLongview, WA10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityPacificorp - West

What this means

Hydroelectric plants spin turbines using falling or flowing water — typically from a dam-impounded reservoir. They are dispatchable, long-lived, and emission-free at the point of generation, though large reservoirs can disrupt rivers and ecosystems and methane can be released from flooded vegetation.

Other plants in Cowlitz County

View all plants in Cowlitz County →